[Cause]
The subsequent GETQUE was called before the ACKQUE was called after the GETQUE.
[Countermeasure]
Correct the TP program logic to call ACKQUE after GETQUE.
The subsequent GETQUE was called before the ACKQUE was called after the GETQUE.
Correct the TP program logic to call ACKQUE after GETQUE.